Construction Diary V: Everything is ready for the interior fit-out.
Construction Diary V: Everything is ready for the interior fit-out.
After the drywall was erected and the floor installations and underfloor heating were laid at the end of January…
- Relaxation room on the upper floor
- Sanitary installations
- Ground installation kitchen
- Electrical cables in the restaurant
- Fill material for screed restaurant
- Fill material for screed Yoga Shala
- Fill material for screed connecting corridor
- Drywall niches in the relaxation room
- Preparation for underfloor heating
- Underfloor heating in the relaxation room
The screed could be installed by the Gruber/Spittal.
- Screed Gastronomy
- Screed rest room with niches
- screed rest room NEW
- Screed Yoga Shala
- exposed concrete sauna corridor
We are already working intensively on the interior design :)