Construction diary IV: Construction phases 1 and 2 are complete
Construction diary IV: Construction phases 1 and 2 are complete

Shortly after the first light snowfalls, the new sauna building was also erected:
- Stairwell
- Wooden facade element
- Sauna extension
- Roof extension sauna
- Relaxation room extension sauna
The functional areas can already be seen in the existing building …
- Roof existing building
- Ground floor with dining area and upper floor with relaxation room
- Relaxation room on the upper floor
- Relaxation room existing building
- Staff area
Everything is being prepared for the construction of the wooden building at the Yoga Shala and diving school.
- Utility shaft of yoga shala
- Preparation of the base plate of yoga shala
- Floor plate for diving school
- Preparations diving school
- Yoga Shala and Diving School
At the campground, road repairs have been completed and the WiFi cabling has been prepared to ensure bandwidth.
- Road became wider
- Additional access points are coming
- Utility shafts
- Empty conduits for fiber optic cables
- Connection to fiber optic cable