Construction diary: Demolition

Construction diary: Demolition

By | Published On: 6. October 2025 | Categories: Camping | 0.7 min read |

With the start of the construction season on October 1st, WinklerBau’s construction machinery arrived and began demolition work. Our team, led by Christoph and Rafael, spent the past two weeks clearing out all the buildings and preparing them perfectly. The machinery and inventory were dismantled and temporarily stored. All electrical and sewer/water lines, as well as the cold storage room, were disposed of. A great deal of metal and sheet metal from the cabin roofs, plastic, and, above all, wood, was found for recycling.